This contract consisted of 100m of track saw cutting of a retaining wall. The wall was 300mm thick and was heavily reinforced using our Hilti TS20 and a 45KVA Generator supplied by CES Electrical Poole.
We had to provide a 1000ltr water container and pump to feed the saw as we used near on 2000ltrs a day. This was filled up using a licensed standpipe and trained operator which is standard procedure when using the local authorities hydrants. Our client has the challenging task of refurbishing and updating the surrounding roads and bridges, whilst keeping the traffic moving without causing delays.
This contract went extremely well and we managed to finish the job ahead of the program which is great for everyone.